Our Projects
Walmart Home Office Campus
One of the largest mass timber office developments in the U.S., Walmart's new Home Office Campus presented unique sustainability challenges due to its remote location and limited opportunities for LEED Location & Transportation credits. ecoREAL partnered with the project team to maximize LEED performance through strategic materials selection, indoor environmental quality, and streamlined certification management—helping the project significantly exceed sustainability targets.
Title
TEST TEST TEST
Title
TEST TEST TEST
Title
TEST TEST TEST
Title
TEST TEST TEST
Title
TEST TEST TEST
Walmart Home Office Campus
How EcoREAL Helped:
As the Lean LEED Construction Administration consultant, ecoREAL partnered with Shawmut Design and Construction and Gensler to develop and execute a targeted LEED strategy focused on the Materials & Resources (MR) and Indoor Environmental Quality (IEQ) credit categories. Using Green Canary software, ecoREAL streamlined LEED documentation, tracked compliance in real time, and coordinated with manufacturers and subcontractors to maximize available certification points.Because the project's location limited opportunities to earn Location & Transportation credits, ecoREAL concentrated on optimizing material transparency, responsible sourcing, life cycle assessment (LCA), and low-emitting products. The team secured 73 Environmental Product Declarations (EPDs) across 34 manufacturers, achieved an 8.5 LCA Optimization score, documented that nearly 58% of the $18.6 million materials budget came from responsibly sourced products, and completed 44 Material Ingredient evaluations. ecoREAL also helped the project achieve exceptional indoor air quality by specifying low-emitting materials, resulting in 100% compliant flooring and ceilings, 99% compliant paints, and 97% compliant composite wood products.Through strategic planning, technical documentation, and proactive coordination, ecoREAL helped the project substantially exceed LEED targets while simplifying the certification process for the entire project team.Key Contributions: KEY CONTRIBUTIONS
73 EPDs across 34 manufacturers (target: 20 EPDs / 5 manufacturers) — 3.6× over target
8.5 LCA Optimization score with 6 manufacturers (target: 5 / 3) — 1.7× over target
57.89% of $18.6M materials budget responsibly sourced (target: 15%) — 3.9× over target
44 Material Ingredient evaluations across 42 manufacturers (target: 20 / 5) — 2.2× over target
Score 9 Material Ingredient Optimization with 7 manufacturers (target: 5 / 3) — 1.8× over target
Low-emitting materials: 100% flooring, 100% ceilings, 99% paints, 97% composite wood
Year
01/01/0001
Industry
TEST TEST TEST
Industry
TEST TEST TEST
Industry
TEST TEST TEST
The Portland Building Reconstruction (LEED Platinum, WELL) ecoREAL Role: Owner's Sustainability Representitive - City of Portland (First WELL Municipal Building)
Walmart Home Office Campus (LEED Platinum) ecoREAL Role: Lean LEED CA, Materials and Resources Strategy, Green Canary deployment
Multnomah County Central Courthouse (LEEDv4 Gold) ecoREAL Role: LEED Project Administrator and Green Canary Software
Multnomah County Health Department HQ (LEEDv4 Gold, Path to Net Zero) ecoREAL Role: LEED Project Administrator w/ Green Canary Software Healthy Materials Tracking
Bull Run Filtration Project (LEED Gold Admin Building, Envision Site Certification) ecoREAL Solutions Role: Owners Rep Sustainability + Green Canary Software
Multnomah County East County Library (LEEDv4 Gold) ecoREAL Role: LEED Project Administrator w/ Green Canary sustainable materials tracking
AC Marriott Hotel Portland (LEED Silver New Construction) ecoREAL Role: Energy Modeling + Fundamental and Enhanced Commissioning
Reynolds School District (Architecture 2030, Path To Net Zero) ecoReal Role: Owner's Rep Sustainability, Energy Modeling
Ilani Casino Hotel (Non-LEED) ecoREAL Role: Health, Safety & Wellbeing Material Tracking, Green Canary Material Tracking and Construction Waste Management
Multnomah County Behavioral Health Resource Center (LEEDv4 Gold) ecoREAL Role: Sustainability Consultant - LEED PA, Energy Modeling + ETO PTNZ / Mortenson Construction utilized Green Canary Software
Prismid Sanctuary ecoREAL Role: Eco-charrette + prevetted material approach
Ritz-Carlton Portland (LEED Gold) ecoREAL Role: LEED Project Administrator w/ Green Canary HSW Material Tracking
Hacienda's Living Cully Multi-Family ecoREAL Role: Sustainability / LEED Admin + Energy Modeling + ETO Incentives
Marriott Pearl Hotel (LEED Silver new construction) ecoREAL Role: LEED Construction Management & Documentation, Green Canary materials tracking
Virginia Garcia Health Center ecoREAL Role: Eco-charrette facilitation, triple bottom line strategy assessment on a limited budget
Franklin High School (LEED Gold) ecoREAL Role: Green Canary Software healthy materials tracking
Hand and Eye Supply, Sustainable & Creative Design (ETO Incentives) ecoREAL Role: Consultant
Plastic Manufacturing Facility (LEED EBOM Study) ecoREAL Role: Healthy Material Tracking with Green Canary
Freeman Motors, Path to Net Zero (Early Design Assistance) ecoREAL Role: Early design assistance, healthy materials tracking
Oregon Energy Department Buildings, Partnership with MWESB ecoREAL Role: Sustainability Consulting
Felton Properties (LEED Silver Certified Retro-Fits) ecoREAL Role: Owner Sustainability Representitive, LEED Project Administrator
Portland Union Station (Historic Building, Non LEED, WELL Building, 2030 Challenge and Path to Net Zero considered in all updates) ecoREAL Role: Sustainability Master Planners